So today's events in short quick points:
- Had another presentation, (mainly used information you guys provided)
- We divided the park into two sections (so we now have the Northern section, and the Southern section)
- We have calculated (with other groups) that there shall be 12000 families that will be taking resistance within our homes. Therefore we will be dividing the 12000 into the two parts (northern and southern section)
- We also wanted to incorporate Wind Mills into our design
- We also (maybe, if possible) wanted to use the surrounding resources as much as possible (ie the steam plant or the train station)
- Also, as it turns out, our location we place the build forms have to correspond to the other team members map, (eg we need to know where Open space decides to place their transit system so we can place our buildings closer to the buses, and subway etc.)
- And as Ian pointed out in class today, the people will only walk within 200 meters of the buildings, so if we have our townhouses down south and the subway is all the way north, the south buildings will not benefit the access routes.
Thanks again
OH right, um apparently there is class this Wednesday (and the final is due next week Monday)
so it will be great if we can have one final group meeting on Wednesday's class.
8 comments:
ah shit, keep forgetting stuff...
anyhow, just wanted to say that our group does need a logo (the one I made sucks crap)
so yea, illustrators~ or anyone who has ideas draw them out for wednesday!!
you mean monday?
tiff
I have the Turbine Figured out..." i think "
I will bring wed.
Cheers
Scott
i will try and get some water facts for the roofs as well.... but can't promise!
;-)
Simon, did Ian give you the footprint info? How much sq. feet is needed to hold 12 thousand people.?
Also:
Everything you wanted to know about roofs!
http://www.greenroofs.net/index.php?option=com_content&task=view&id=26&Itemid=40
Maybe someone understands these figures/numbers/specs.... lots there!
gotta study, cheers
Ok i know its kind of late....but i didnt get a hold of comp by now...I can try and think of sum ideas 4 a logo but i cant promise they r gunna b good lol....and also i can do sum drawings in autocad 2morrow in class for our buildings :)
Srry to everyone that i didnt put more input in this project but ive been busy so much in past 2 weeks...(skool+worK) and i know ur guys in the same boat :S
does the absolute final have to be in tomorrow or Monday?
I'm kinda confused.
If it's not already too late, I have been reading a lot about windows and incorporating them into home design to decrease energy usage (AC, heating and lighting) that would be interesting to incorporate with sky lighting and solar power.
simon...srry i didnt end up coming this morning to class i didnt feel well....whatever info u need and we still didnt find it plz let me know ill research it and send it to u....anything u need just send me an email and ill try to find it
Thanx
Post a Comment